DAY 1 – Monday, 17 March 2025, 09:00-17:00
Opening Remarks/Introductions |
M1L: Presentation: Review Agenda and Overarching Learning Objectives |
M2L: Presentation: Overview of the A/CPPNM and IAEA Nuclear Security Series of Publications Related to the International Nuclear Security Regime |
M2E: Exercise: Q&A Module 2 |
M3L: Presentation: Establishing, Implementing and Sustaining a National Regulatory Infrastructure for Nuclear Security |
M3E: Q&A of Module 3 |
M4L: Presentation: Introduction to Nuclear Security Management Principles |
M4E Exercise: Preparation of Site Security Management Policy Statement |
M5L: Presentation: Overview of Operational Interfaces for Nuclear Security |
M5E: Exercise: Identification of Operational Interfaces for a Defined Operational Scenario |
M6L: Presentation: Overview of the Hypothetical Lone Pine Nuclear Power Plant Operations and Management Structure |
M6L: Presentation: Overview of the Hypothetical Material Test Research Facility (MTRF Operations and Management Structure) |
DAY 2 – Tuesday, 18 March 2025, 09:00-17:00
M7D: Demonstration: Review the NAI Model for Conducting the Practical Exercises |
M8L: Presentation: Fundamentals of Physical Protection |
M8D: Demonstration: Scribe3D and PathTrace Demonstration of Physical Protection System Design for the Lone Pine Nuclear Power Plant |
M9L: Presentation: Fundamentals of Nuclear Material Accounting and Control Used to Support Nuclear Security |
M9E: Exercise: NMAC Measures and Operational Interfaces |
M10L: Presentation: Fundamentals of Protective Force Response |
M10E: Exercise: Response Force Win/Lose Timeline |
M11L: Presentation: Fundamentals of Insider Threat Mitigation |
M11E: Exercise: Identifying Insider Threat Indicators Case Studies |
M12L: Presentation: Fundamentals of Cybersecurity |
M12E: Exercise: Identification and Mitigation of Cyber Attack Vectors for the Lone Pine Nuclear Power Plant |
M13L: Presentation: Fundamentals for Securing Nuclear Material During Transport between Sites and within a Site Boundary |
M13E: Exercise: Identification of Operational Interfaces for Secure Transport of Nuclear Material (Fresh Fuel Receipt Scenario for Lone Pine Nuclear Power Plant) |
DAY 3 – Wednesday, 19 March 2025, 09:00-17:00
Demo at SNL UAS Station located on Kirtland Air Force Base: |
M14L: Overview of Emerging Threat Scenario – Uncrewed Aerial System |
M14D: Demonstration: Group Demonstration of UAS/CUAS |
Travel to Integrated Security Facility |
Tour/Demonstration - Integrated Security Facility |
M15L: Presentation: Establishing, Implementing and Sustaining a Facility Performance Evaluation Program |
M15E: Exercise: Developing a Performance Evaluation Approach to Assess Effectiveness of Mitigation Measures to Address Unauthorized Removal at MTRF |
M15R: Review: Facilitated Review of the M19E Module Results |
DAY 4 – Thursday, 20 March 2025, 09:00-17:00
M16L: Presentation: Overview of Nuclear Security Event Scenario No. 1 - Sabotage: Cyber Attack on the Lone Pine NPP |
M16E: Exercise: Identifying Critical Interfaces to Manage Response to the Cyber Attack on the Lone Pine NPP |
M16R: Review: Facilitated Review of the M16E Module Results |
M17L: Presentation: Overview of Nuclear Security Event Scenario No. 2 – Unauthorized Removal: Removal of Fresh Fuel Assembly by an Insider during a Physical Inventory Taking at the MTRF |
M17E: Exercise: Identifying Critical Interfaces to Manage Response to Unauthorized Removal of Fresh Fuel Assembly by an Insider during a Physical Inventory Taking at the MTRF |
M17R: Review: Facilitated Review of the M18E Module Results |
M18L: Presentation: Fundamentals of Root Cause Analysis |
M18D: Demonstration: Facilitated Demonstration of a Root Cause Analysis for a Facility Nuclear Security Event Scenario |
DAY 5 – Friday, 21 March 2025, 09:00-12:00
M19L: Presentation: Establishing, Implementing and Sustaining a Facility Corrective Action Program |
M19E: Exercise: Drafting a Corrective Action Plan to Address the Root and Contributing Cause(s) Identified in Module 20D.M |
M19R: Review: Facilitated Review of the Results for Module M19E |
Level 2 Post Survey of Course |
Q&A, Closing Remarks, Adjourn |